Gadens Point Shoreline Stabilization Project at Belle Fourche Reservoir
November 22, 2024
November 22, 2024
WASHINGTON, Nov. 22 -- The U.S. Department of the Interior's Bureau of Reclamation issued the following news release:
The Bureau of Reclamation has awarded a contract for $1,430,277.54 to RJS Construction Inc. of Spokane Valley, Washington to stabilize 2,700 feet of eroding shoreline along the south side of Gadens Point at Belle Fourche Reservoir. The project will reduce ongoing shoreline erosion along Gadens Point and ensure safe public vehicle travel to recreational facilities alo . . .
The Bureau of Reclamation has awarded a contract for $1,430,277.54 to RJS Construction Inc. of Spokane Valley, Washington to stabilize 2,700 feet of eroding shoreline along the south side of Gadens Point at Belle Fourche Reservoir. The project will reduce ongoing shoreline erosion along Gadens Point and ensure safe public vehicle travel to recreational facilities alo . . .