U.S. Army Corps of Engineers Seeks Public Comment for Draft Environmental Assessment for Sand Creek Flowlines at Garrison Project, N.D.
October 05, 2024
October 05, 2024
OMAHA, Nebraska, Oct. 5 -- The U.S. Army Corps of Engineers-Omaha District issued the following news release:
Williston, ND -- The U.S. Army Corps of Engineers Omaha District announced a draft environmental assessment is available to review for Rough Rider Operating, LLC and Oasis Petroleum North America, LLC requesting the reissuance of a real estate easement from USACE for the continued occupation of six existing oil- and gas-related production flowlines installed in 2014 via hori . . .
Williston, ND -- The U.S. Army Corps of Engineers Omaha District announced a draft environmental assessment is available to review for Rough Rider Operating, LLC and Oasis Petroleum North America, LLC requesting the reissuance of a real estate easement from USACE for the continued occupation of six existing oil- and gas-related production flowlines installed in 2014 via hori . . .