UPDATE: Interim Repairs Near Completion at Arkabutla Dam; Study Underway for Long-Term Solutions
September 05, 2024
September 05, 2024
VICKSBURG, Mississippi, Sept. 5 -- The U.S. Army Corps of Engineers-Vicksburg District issued the following news release:
The U.S. Army Corps of Engineers Vicksburg District (USACE-MVK) continues to advance interim risk reduction measures (IRRM) at Arkabutla Dam in Northwest Mississippi that are scheduled to be completed by late September 2024. These measures include adding piezometers to increase real-time monitoring of groundwater pressure and installing relief wells to relieve wa . . .
The U.S. Army Corps of Engineers Vicksburg District (USACE-MVK) continues to advance interim risk reduction measures (IRRM) at Arkabutla Dam in Northwest Mississippi that are scheduled to be completed by late September 2024. These measures include adding piezometers to increase real-time monitoring of groundwater pressure and installing relief wells to relieve wa . . .